Page 65 - DIGITAL ISSUE MAY 2018
P. 65

ROAD & ROAD CONSTRUCTION EQUIPMENT
                                                                                                                    CASE STUDY






























           Concreting Record Creation:        SPECIFICATION:
           In November 2017, 2 nos Stetter Concrete   Name of Project:   Eastern Peripheral Expressway.
           Batching Plant M2.5 worked non-stop   Name of Customer:  Ashoka Buildcon, Gayatri Projects, Jaiprakash Associates,
                                         3
           to produce a total volume of 6750 m  of             Oriental Structural Engineers and Sadbhav Engineering.
           Pavement uality Concrete in a single   SSI Equipment:    19 batching plants, 5 chilling plants, 47 transit mixers,
           working  day  to  create  a  never  surpassed       10 stationary concrete pumps and 6 concrete boom pumps.
           "New World Record" in the Eastern
           Peripheral Expressway project through the   To make this expressway, 20 countries of the   being done via drip irrigation.
           execution by Sadbhav Engineering.  World have been studied.   is is India's  rst  Along the expressway’s length, there are
                                              such expressway in which the weight of the   wayside amenities like petrol pumps, rest
           Smart, Green Expressway            vehicles will be made before reaching the  areas, hotels, restaurants, shops, repair
             e Expressway is equipped with the latest,   entry point and it will be dealt with whether   services, etc. There are ambulances and
           world class smart technology and road   the entry of the said vehicle is within the   cranes on this expressway at every 20
           safety features like intelligent highway   limit. Interestingly, if the vehicle overload   kilometers. At every 2.5 km, there are
           traffic management system, variable   is found then the exit gate will open   toilets-keeping in line with the Swachh
           message signs, CCTV, warning devices, over   automatically instead of the entry point.   Bharat  mission.  While  passing  on  the
           speed checking system, weigh-in-motion,   It is the country’s  rst green highway, with   Eastern Peripheral Expressway, one will
           pavement management systems and  ber   landscaping,  plantation  with  nearly 2.5   be able to see 36 monuments from the air
           optic network, real time video incident  lakh trees and fully lit by solar energy 100   temperature to the utab Minar, Hawa
           detection system and a closed tolling   per cent.   ere is provision for rainwater   Mahal, India Gate, Lalkila, four minarets,
           system where the toll will be charged on   harvesting every 500 metres on either side of   Jallianwala Bagh, Ashok Chakra, Kirti
           the distance travelled.            the Expressway, with watering of the plants   Colony, etc.























                                                                              MAY 2018 |CONSTRUCTION OPPORTUNITIES  71
   60   61   62   63   64   65   66   67   68   69   70