Page 41 - Construction_Opportunities_April_2026
P. 41

TICKER TAPE
         MAJOR DEVELOPMENT BOOST FOR TELANGANA AS          The railway projects inaugurated include multiple sections of the
       NARENDRA MODI LAYS PROJECT FOUNDATION STONES.       118-km Kazipet–Vijayawada multi-tracking project, covering the
       Narendra Modi recently virtually laid the foundation stone and   Warangal–Kazipet, Nekonda–Mahabubabad and Errupalem–
       inaugurated development projects worth around `9,400 crore   Dornakal Junction stretches, aimed at improving capacity and  INFRASTRUCTURE
       in Telangana.                                       connectivity on the busy corridor.
       Among the projects for which foundation stones were laid is   Located in Warangal, the Kakatiya Mega Textile Park has been
       the four-laning of National Highway-167 from Gudebellur to   developed at an estimated cost of around `1,700 crore and
       Mahabubnagar on the Hyderabad–Panaji Economic Corridor,   spans 1,327 acres. It is India’s first fully functional PM MITRA Park
       along with development of the Zaheerabad Industrial Area in   and is designed to operationalise the Centre’s 5F vision — Farm
       Sangareddy district.                                to Fibre to Factory to Fashion to Foreign — to strengthen the
       The Prime Minister also inaugurated several key infrastructure   textile value chain and boost exports.
       projects, including sections of the Kazipet–Vijayawada railway   Narendra Modi said the textile park would accelerate India’s
       multi-tracking project, a Greenfield POL (Petroleum, Oil and   textile  sector growth and  generate  large-scale employment
       Lubricants) terminal in Hyderabad, the Kazipet rail under rail   opportunities, particularly for women. The project is expected to
       bypass, and the Kakatiya Mega Textile Park, also known as the   attract investments of over `6,000 crore and create more than
       PM MITRA Park.                                      24,400 jobs, with 62% of the land already allotted.

        METRO 5A APPROVED AT `4,063 CRORE, OPENS WAY       approval, while an additional `120 crore proposal has been
           FOR SINDHU NAGAR STATION IN ULHASNAGAR.         submitted to the state government. A `220 crore project aimed
       The long-pending demand for a Sindhu Nagar metro station   at developing an independent water source is also underway,
       is set to be realised under the Metro 5A corridor after the state   with efforts focused on ensuring round-the-clock water supply
       government cleared `4,063 crore for the project, BJP MLA Kumar   in the future.
       Ailani said recently.                               On urban redevelopment, Ailani said regular review meetings
       Speaking at a press conference, Ailani said Chief Minister   are being held to speed up building regularisation processes.
       Devendra Fadnavis had earlier assured during an election rally   He added that issues related to the Assistant Director of Town
       in Ulhasnagar that metro connectivity would be extended to the   Planning (ADTP) have been resolved, which is expected to
       city and that one of the stations would be named Sindhu Nagar,   accelerate the redevelopment of dilapidated structures and
       reflecting the region’s cultural identity.          boost municipal revenue. He also said efforts are being made to
       “This has been a long-standing demand of residents, and with   resolve the city’s dumping ground issue and explore engineering
       the sanction of funds for the metro project, it now appears closer   options such as underground or double-decker metro alignments
       to reality,” he said. He also thanked Deputy Chief Minister Eknath   to minimise disruption.
       Shinde and MP Shrikant Shinde for their support in advancing   Meanwhile, work on seven major roads being executed by the
       the project, which is expected to significantly improve regional   Mumbai Metropolitan Region Development Authority (MMRDA)
       connectivity.                                       is nearly 90% complete. Additional works, including dividers and
       Alongside the metro development, Ailani highlighted several   paving blocks, will be taken up shortly. A separate `65 crore
       other infrastructure initiatives in Ulhasnagar. He said a `99 crore   allocation has also been sanctioned for internal roads and
       proposal for concretising key city roads is in its final stage of   public toilets ahead of the monsoon, he added.

        NARENDRA MODI LAUNCHED `42,000 CRORE UTTAR         over 160 projects worth around `6,350 crore. Completed projects
       PRADESH INFRA PUSH, FLAG OFF GANGA EXPRESSWAY.      valued at more than `1,050 crore include road widening works,
       Prime Minister Narendra Modi launched and laid the foundation   rail overbridges, and a 55 MLD sewage treatment plant.
       for infrastructure and development projects worth over `42,000   He also launched rural drinking water initiatives under the Jal
       crore, covering sectors such as transport, urban services,   Jeevan Mission, along with urban development and community
       healthcare, and tourism.                            infrastructure projects such as a synthetic hockey turf, an old-age
       A major highlight of the visit was the inauguration of the 594-  home, and a solar power facility.
       km Ganga Expressway, one of India’s longest access-controlled   Foundation stones were laid for projects worth approximately
       highways. The project, valued at `36,230 crore, is a six-lane   `5,300 crore, including a 500-bed super-speciality hospital, water
       greenfield corridor—expandable to eight lanes—linking Meerut   and sewerage schemes under AMRUT 2.0, tourism upgrades at
       to Prayagraj across 12 districts. It is expected to significantly cut   key ghats, and administrative infrastructure.
       travel time between the two cities from 10–12 hours to around six   Additionally, the Prime Minister flagged off two new Amrit
       hours, improving logistics and regional connectivity.  Bharat Express trains—connecting Banaras to Pune (Hadapsar)
       The expressway also features a 3.5-km emergency landing strip   and Ayodhya to Mumbai (Lokmanya Tilak Terminus)—to boost
       in Shahjahanpur, adding a strategic defence component, and   affordable long-distance travel. A major rail capacity expansion
       is expected to serve as an industrial backbone with more than   project between Varanasi and Pandit Deen Dayal Upadhyaya
       2,600 hectares earmarked for manufacturing and logistics hubs   Junction, including a rail-cum-road bridge over the Ganga,
       along its route. In Varanasi, the Prime Minister attended a Mahila   will also be launched to ease congestion and improve freight
       Sammelan and inaugurated or laid the foundation stone for   movement.


                                                                         APRIL 2026|CONSTRUCTION OPPORTUNITIES  41
   36   37   38   39   40   41   42   43   44   45   46