Page 45 - Construction_Opportunities_Oct_2026
P. 45

POST BAUMA CONEXPO INDIA
       works within its normal operating range.            and a shear kit for cutting reinforcement. No booster is needed.
       What the customer takes from that is not a machine. It is material   Warranty is 24 months.
       that no longer has to move.                         A demolition contractor who already runs an MB attachment owns  INTERACTION
                                                           the second half of the process. Bring the structure down, then
       What are the USPs of your products vis-à-vis competitors? What   crush the debris into usable aggregate on the same slab, with
       is your company’s focus on R&D and technological innovation?  the same carrier and operator.
       I would rather describe what the machine is than what other   Alongside it we showcased the BF90.3 with a live demonstration,
       machines are not. A crusher bucket is a jaw crusher first and   together with the BF60.1, the MB-L160, the R900 drum cutter and
       a bucket second. That distinction matters, because the failure   the S-18 screening bucket. The demonstration was the point of
       mode in this category is a bucket with jaws bolted into it: the   the stand. Nobody here has been convinced by a static machine
       structure flexes, the jaw gap wanders, and output size stops being   under lights.
       repeatable by the third month.
       Ours is built the other way round. The body and structural frame   Do you practise ‘Make in India and Sell Globally’ — using your
       are built so that the crushing chamber holds its geometry under   India manufacturing base to supply the global market?
       load. The jaw plates are designed to keep their edge over time   No, and I would rather answer that plainly than leave room
       and can be turned rather than replaced, and a blockage clears   for inference. MB has no manufacturing base in India. Every
       without emptying the bucket by hand. Output size is set on site   machine we sell anywhere in the world is designed and built at
       to match the material.                              Fara Vicentino in Italy, at a single site, and exported to more than
       Research and development sits in the same building as   150 countries.
       production at Fara Vicentino. It means a design change and the   That is a deliberate decision, not an omission. This is a wear
       machine it affects are twenty metres apart, and that something   product working under high cyclical load, and The variables
       observed on a site in India can be tested against the same steel   determining whether a crushing chamber holds its geometry
       that will be cut for the next batch.                over years of heavy use are metallurgical and dimensional, and
                                                           they are unforgiving of variation. Keeping design, testing and
       After-sales service as a strategic differentiator.  production inside one building means a change to any of those
       It is the differentiator, and that is true of any attachment in this   is verified against the machine itself rather than communicated
       category.                                           down a supply chain and hoped for.
       A crusher bucket is a wear machine, deliberately built so that   What is in India is the part that has to be: the company itself,
       the components taking the punishment are the components   present since 2013, with coverage across the country, and more
       you replace: jaw plates, chamber liners, hydraulic seals. The   than a decade of field data from Indian material feeding back
       consequence is that purchase price is not really the decision.   into what gets built in Italy.
       What matters is whether the wear items are there when the   Localisation is a fair question. My answer is that we localise the
       machine needs them, and whether the cost of running it over   parts of this business that benefit from being local, and we do
       several years can be budgeted at the start rather than discovered   not localise the part that does not.
       along the way.
       What matters to us is how many days in the year the machine   What is your outlook for the components industry and your
       could actually work, not how quickly someone shows up after it   company going forward?
       stops. The question is not how quickly somebody arrives after a   The carrier is becoming the platform, and the attachment is
       breakdown, but how many days in the year the machine could   becoming the thing that decides what the carrier is for. The
       not work. Wear here is predictable and published to the customer,   question moves from how many machines do I need on this
       and a contractor who knows those intervals plans around them   site to how many functions can I get from the machine I already
       instead of reacting to them.                        have.
       What I would resist is the idea that service begins once the   Two pressures push the same way. Sites are more constrained
       invoice is settled. A machine that stops on a rural project two   than they were: urban work with neighbours on three sides, tunnel
       hundred kilometres from anywhere does not cost a repair. It   and slope work with no room for a plant, sites where material
       stops the project. That is the cost we are managing, and the one   has to be dealt with where it lies. And skilled operators are not
       contractors here ask about first.                   abundant. Equipment that needs one man and one carrier rather
                                                           than four men and three machines is not a convenience there. It
       Detail the new products launched at bauma CONEXPO INDIA.  is the only arrangement that can be staffed. The environmental
       We were on stand O.D15, and the machine we have brought to   argument arrives at the same place by a different route, which is
       India for the first time is the MB-PT1650 demolition pulverizer.  why I do not treat it as a separate agenda.
       It is MB’s first move into primary demolition rather than the   For our own part, the work ahead is unglamorous. Keep the
       processing that follows it. The PT series offers 360-degree   machines available and the wear parts moving. Keep testing on
       continuous hydraulic rotation, so the operator presents the jaw   the material contractors here actually feed them.
       at the angle the structure requires instead of repositioning the   Keep explaining a category that still surprises people the first time
       carrier. Three jaw kits are interchangeable on the same body:   they watch it work. This market rewards patience and punishes
       crushing for primary work, pulverizing for reducing what is left,   noise.


                                                                      OCTOBER 2026|CONSTRUCTION OPPORTUNITIES  45
   40   41   42   43   44   45   46   47   48   49   50