Page 60 - CO_July_2022
P. 60

GUEST ARTICLE   INDUSTRY WATCH                       2.  Liu Davis, Wan Sammy. Presentation- Balanced Scorecard

                                                                   publication/331650837 _ BALANCED _ SCORECARD _ IN _
              Return on Capital Employed (ROCE), Current Ratio (CR), Debt
                                                                   CONSTRUCTION
              Service to Credit Ratio (DSCR), Debt Equity Ratio (DER) were
              considered for evaluation. The company performed poorly
                                                                   for Quality Excellence in The Construction Industry: A Success
              on the NPR and the ROCE. This indicates that the company
                                                                   Story, “Strategic Performance Management Through
              faced schedule and cost overruns.
                                                                   Balanced  Scorecard:  Local  Experience”  Seminar,  Hong
                                                                   Kong Society for Quality.
           The overall implications of the survey within MCC Ltd revealed
           that
                                                                   years”. Nirmala Sitharaman. PTI October 20, 2019, 09:23 IST
           •   The overall score of the company was average, with a large   3.  “India to spend $1.4 trillion on infrastructure in next five
              margin for improvement                               https://auto.economictimes.indiatimes.com/news/industry/
           •   The company needed a higher degree of improvement in   india-to-spend-1-4-trillion-on-infrastructure-in-next-five-years-
              the innovation & learning score                      nirmala-sitharaman/71670415
           •   HR practices of the company needed to be reviewed as the   4.  Report Mordor Intelligence 2016-26. INDIA CONSTRUCTION
              people function had the lowest scores                MARKET  – GROWTH,  TRENDS,  COVID-19 IMPACT, AND
           •   The BSC analysis was successful in revealing the cause-and-  FORECASTS (2021 – 2026) https://www.mordorintelligence.
              effect relationship between the four perspectives.   com/industry-reports/india-construction-market-growth-
                                                                   trends-and-forecast-2019-2024.
           The BSC framework a company’s capability to serve the global   5.  ENR’s 2019 Top 250 Global Contractors https://www.enr.com/
           market will need to undergo significant transformation. It also   toplists/2019-Top-250-Global-Contractors-1
           points to the unresolved potential of the rest of the industry to   6.  Kaplan, R. S.; Norton, D. P.; The Balanced scorecard –
           close ranks with leading global contractors.            measures that drive performance, Harvard Business Review,
           *(the name of the EPC organisation is masked for confidentiality.   1992, 134-47
           The study was an academic exercise for research purpose only)  7.   Stefan Koprivica, Jovan Škondrić and Milica Bendić (2021).
                                                                   Balanced Scorecard Implementation In Construction                                                            19-21 SEP 2022
           Conclusion                                              Industry. 8th International Conference Contemporary                                                          THE INDIAN TRADE SHOW
           The importance of the Indian EPC industry to raise its standards   achievements in civil engineering 22-23. April 2021. Subotica,                                    FOR CONSTRUCTION, INFRA
           to become world-class suppliers of infrastructure cannot be   SERBIA. UDK: 005.6/.8 DOI: 10.14415/konferencijaGFS2021.56                                             AND MINING MACHINERY
           underscored enough.                                 8.  Bhansali, D. and Agarwal A. (2012). Master’s Thesis,
           The ability to take up capital-intensive, high gestation projects   “Performance Measurement: A conceptual framework
           requires not only an appropriate macro environment, but in   for a construction company using the balanced score
           greater measure, a vibrant and capable industry, which has   card”. National Institute of Construction Management and
           world-class players to be able to bid for them.         Research, India.
           Unlike China, its closest neighbour, India still has a long way to   9.   Vukomanovic Mladen  and  Radujkovic Mladen (2011).
           go in this regard. India and China, with a host of similarities, are   The Balanced Scorecard and EFQM Working Together In
           way too different in their capabilities to attract and win foreign   A Performance Management Framework In Construction
           contracts.                                              Industry. Journal Of Civil Engineering And Management ISSN
           While it is common agreement that comparing India’s progress   1392-3730 print/ISSN 1822-3605 online 2013 Volume 19(5):
           with China, is unfair given China’s government policies that   683695 doi:10.3846/13923730.2013.799090
           renders fair competition impossible.                10.  Dilanthi Amaratunga, David Baldry, (2002), “Moving from
           Be that the case, however, China has built world-class   performance measurement to performance management”,
           infrastructure within its country and effectively exported its   Emerald Insight, Facilities,Vol. 20 Iss 5/6 pp. 217 – 223
           construction advantage abroad, to become a $15.66 trillion   11.  Blog Rachel Smith, 20 Companies Using the Balanced
           economy.                                                Scorecard (&  Why)  https://www.clearpointstrategy.com/
           There are twelve times more Chinese companies in the ENR 250   companies-using-the-balanced-scorecard/
           ranking, vis a vis India. This in itself points to the humungous   12.  China poverty ratio (2020). https://www.statista.com/
           technical and managerial capability China has been able to   statistics/1086836/china-poverty-ratio/
           build in the past two decades (Chen and Shah, 2014).  13.  Report The World Bank in China, Country Page, WB. https://
           The Indian EPC industry when competing in the global market   www.worldbank.org/en/country/china/overview
           would need to adopt cutting strategies if it has to take on the   14.  Chen C., Martek I., Shah M. N., (2014). ‘The Advantages of the
           might of the world’s leading players.                   Construction Sector of China and India: A Comparison’, May
           To that end, the use of the Balanced Score Card could act as   19-21, 2014. Full Paper Accepted. Construction Research
           powerful enabler for organizations to score over competition.  Congress, Georgia Institute of Technology, School of Building
           Key References                                          and Construction.
           1.   Dragan Katic, Ladislav  Bevanda (2010). Balanced
              Scorecard in Construction, International Scientific   For more details contact:
              Conference People Buildings and Environment, 10-12 Nov,   Email: vayati@vayatisystems.com; vayatisystems@gmail.com
              2010, Kritny, Czech Republic https://www.researchgate.net/  Website: www.vayatisystems.com


        60   CONSTRUCTION OPPORTUNITIES|JULY 2022
   55   56   57   58   59   60   61   62   63   64   65