Page 45 - CO_July_2022
P. 45

TICKER TAPE

            FIRST TRAINSET OF DELHI-MEERUT RRTS REACHES DUHAI
                       DEPOT FROM SAVLI, GUJARAT
           The first trainset of the country’s first Regional Rapid Transit System
           has reached Duhai Depot. The Delhi-Meerut RRTS trainset was                                              INFRASTRUCTURE
           loaded on a trailer from the manufacturing plant located in Savli,
           Gujarat and it was brought to Duhai via road. The RRTS train, in its
           journey to reach Duhai Depot, has travelled through the states
           of Rajasthan, Haryana, and Uttar Pradesh. According to the
           National Capital Region Transport Corporation (NCRTC), all the
           six coaches of the Delhi-Meerut RRTS trainset were loaded on six
           separate trailers. The coaches, on reaching the Duhai depot, were
           unloaded with the help of a crane. In the coming days, the RRTS   Delhi-Ghaziabad-Meerut RRTS corridor is likely to reduce CO
                                                                                                                2
           trainset will be assembled in the Duhai Depot itself.  emissions by about 2,50,000 tonnes per year. The Corporation
           The NCRTC further said the tracks have been completed already   had also claimed that the RRTS project will prove to be the most
           for the trainset’s arrival at the Duhai depot and now preparations   energy efficient futuristic transit system, ushering in a new era for
           are going on for the testing. Besides, an administrative building   seamlessly connected mega-regions as well as setting a new
           has been established in the Duhai depot itself for the operation   benchmark for similar projects in the future. The NCRTC is striving
           of RRTS trains. Under the government’s ‘Make in India’ initiative,   for the timely completion of this RRTS project. The Corporation is
           Alstom was awarded the contract of manufacturing the RRTS trains,   planning to commence the operation on the priority section by
           as per which, they would be delivering 40 RRTS trainsets, including   the next year and commission the entire corridor by the year 2025.
           10 three-car trainsets for Meerut Metro, bundled with rolling stock   Once completed, the public will be able to cover the distance
           maintenance for 15 years. According to NCRTC, the upcoming   from Delhi to the city of Meerut in just 55 minutes.

            WELSPUN ENTERPRISES TO SELL OPERATIONAL HIGHWAY      VARIOUS INDIAN RAILWAYS PROJECTS LAUNCHED IN
                  PROJECTS TO ACTIS FOR `6000 CRORE                      WEST BENGAL’S HOOGHLY DISTRICT
           Welspun Enterprises Limited has executed definitive agreements to   The Eastern Railway zone has augmented various passenger
           exit its portfolio of operating road concessions (“Highway Portfolio”)   facilities and amenities at different stations in the district of
           to Actis Highway Infra Limited (“Actis”) for an aggregate Enterprise   Hooghly. The Minister of State for Railways, Raosaheb Patil Danve,
           Value of ~`6,000 crore. The Highway Portfolio comprises of 5   dedicated to the nation, multiple railway projects including the
           completed HAM assets (Welspun Delhi Meerut Expressway Private   newly completed Third Line between Bandel and Magra stations,
           Limited, Welspun Road Infra Private Limited, MBL (CGRG) Road   Yard remodelling as well as the commissioning of the country’s
           Limited, MBL (GSY) Road Limited, Chikhali Tarsod Highways Private   largest Electronic Interlocking Cabin at Bandel covering as many
           Limited) and one operating BOT-Toll asset (Welspun Infrafacility   as 1002 routes, Modification of Electronic Interlocking at Magra,
           Private Limited).                                   Yard remodelling and commissioning of Electronic Interlocking at
           In a regulatory filing, the company said that it may be noted that   Adisaptagram. Besides, the minister also dedicated new station
           the aforesaid EV excludes construction linked milestone / grant   buildings including Electronic Interlocking at Chandannagar
           payments of ~`3,000 crore received/receivable from National   Station, New Station Building and Platform Shelter at Kamarkundu,
           Highways Authority of India and Public Works Department of   New ROB at Kamarkundu Station, Extended FOB at Balarambati,
           Government of Maharashtra (“PWD”), thus, valuing the Highway   Mirzapur Bankipur and Adisaptagram stations.The minister also
           Portfolio being exited at ~`9,000 crore.            dedicated to the nation Raised/Extended/Widened platforms at
           The Highway Portfolio as on the date of First Closing is expected   Adisaptagram, Kamarkundu, Balarambati, and Mirzapur Bankipur
           to have a debt of `3,627 crore and a total equity investment of   stations, up loop line platform at Magra railway station, Extended
           `1,613 crore. The completion of the above transaction is subject   Subway at Adisaptagram railway station. Danve also laid the
           to completion of customary and regulatory compliances and   foundation stone for new Road Under Bridge at Kamarkundu
           approvals from NHAI, PWD, and lenders, said company.  station today through video conferencing. According to Eastern
           Post this proposed exit, the Company’s road asset portfolio   Railways, all the projects pertaining to the district Hooghly in West
           would comprise of two under-construction HAM road projects   Bengal come to the tune of `254 crore.
           (Sattanathapuram - Nagapattinam and Aunta – Simaria Road   Danve said the commissioning of the third line between Bandel
           projects) which have a total project cost of `3,900 crore. The   – Magra, 6.99 km stretch, will make provision for seamless traffic
           Company has a robust EPC order book of  `12,500 crore,   movement  from Bandel to Bainchi as well as increase the
           comprising of `6,500 crore in water sector and balance `6,000   mobility o¬n Howrah-Barddhaman Main Line. With the third line
           crore in road sector.                               commissioning between Bandel-Magra, the world’s largest state-
                                                               of-the-art Electronic Interlocking System has been commissioned
                                                               at Bandelrailway station, he further mentioned. To provide more
                                                               comfort to passengers at station premises, the Eastern Railway
                                                               zone has augmented various passenger facilities and amenities
                                                               at different stations in the district of Hooghly, the minister added.


                                                                              JULY 2022|CONSTRUCTION OPPORTUNITIES  45
   40   41   42   43   44   45   46   47   48   49   50