Page 44 - CO_July_2022
P. 44

INFRASTRUCTURE  TICKER TAPE                          traffic congestion at Vikram Shila Setu bridge in Bhagalpur. Also, it

                                                               will provide impetus to the creation of employment opportunities
                                                               for the local population, he said. The project is targeted for
                                                               completion by October 2024. The New India is being forged with
                                                               the vision of incredible infra everywhere, the minister added.
                                                               Meanwhile, Gadkari, in another series of tweets, informed that
                                                               the project work is progressing at a rapid pace for the six-laning of

              NITIN GADKARI LAUNCHES 15 NATIONAL HIGHWAY
                                                               state of Andhra Pradesh. This highway project is being developed
                PROJECTS WORTH `13,500 CRORE IN BIHAR          National Highway -140 between Chittoor and Mallavaram in the
                                                               under the Bharatmala Pariyojana of the Modi government.
           Union Minister for Road Transport and Highways Nitin Gadkari   Gadkari also mentioned that this section of the National Highway
           inaugurated and laid foundation stones of 15 National Highway   connects major towns in the district of Chittoor i.e. Chittoor and
           projects in Patna and Hajipur in Bihar with a total cost of `13,585   Tirupati via Kanipakam.
           crore. Speaking on the occasion Gadkari said Mahatma Gandhi
           Setu is the lifeline of Bihar, which connects North Bihar with South   SIX-LANING OF NH-140 FROM CHITTOOR TO
           Bihar. With this super structure replacement project, the time taken   MALLAVARAM IN ANDHRA PRADESH PROGRESSING AT A
           to cross Mahatma Gandhi Setu has been reduced from 2 to 3               RAPID PACE
           hours to 5 to 10 minutes. He said Chhapra-Gopalganj section   The project is being developed under the Modi government’s
           being 2-lane with 4 bypasses will allow the traffic of the highway   Bharatmala Pariyojana. Recently, Union Minister of Road Transport
           to pass through the bypass and the city will get rid of traffic jams.  and Highways Nitin Gadkari said the team of the Ministry of Road
           The Minister said the route from Umagaon will directly connect   Transport and Highways is working on a mission mode 24×7 to
           the religious places of Uchhaith Bhagbati and Mahishi Tarapith.   make ‘New India’, the ‘infrastructure hub of the world’. In a series
           Aurangabad – Chordaha section 6-lane road will improve   of tweets, the Union Minister said taking the mission forward, the
           connectivity of Bihar with Uttar Pradesh, Jharkhand and West   project for six-laning of National Highway (NH)-140 from Chittoor
           Bengal. Minister Gadkari said Munger - Bhagalpur - Mirzachowki   to Mallavaram in the state of Andhra Pradesh is progressing at
           section 4-lane greenfield road will facilitate the farmers of this   a rapid pace. The project is being developed under the Modi
           region to deliver their crop across the country, which will increase   government’s Bharatmala Pariyojana. According to Gadkari,
           the income of the farmers.                          this National Highway section connects important towns in the
           He  said  the  2-lane  road  being  built on  NH-80  will  facilitate   district of Chittoor i.e. Chittoor and Tirupati via Kanipakam, a
           connectivity between Bihar, Sahibganj and Assam  connecting   religious place. The Union Minister of Road Transport and Highways
           with the Inland Waterways Terminal reducing the logistics cost.   further said the project length starts at Kukkalapalli and it ends
           Shri Gadkari said apart from this, traffic will be facilitated from   at Mallavaram. It consists of two bypasses at Kasipentla and
           Begusarai elevated flyover, Jayanagar bypass ROB and long jams   Kanipakam, 6 Major Bridges and around 15 minor bridges as well
           of level crossings will be avoided. With the construction of Ara   as 14 grade separators. The Union Minister further said the length
           4-lane road from Kayamnagar, the traffic for Ara will be smooth,   of the project is operational since the month of May 2021 and
           he added. Construction work of New Link NH-133B in Jharkhand   the balance works are likely to be completed by 30 September
           including Ganga Bridge going in full swing. Once constructed, the   2022. After the completion of the project, the region would see
           highway shall connect Sahibganj in Jharkhand to Manihari in Bihar.  dynamic transformation with enhanced connectivity that would
           The construction work of New Link National Highway (NH)-133B from   further give a boost to economic activities as well as religious
           0.200 km in the state of Jharkhand to 15.885 km including Ganga   tourism, Gadkari added. Meanwhile, Gadkari also informed that
           Bridge, development work of Manihari Bypass from 0.000 km to   the project for the construction of New Link National Highway -133B
           5.500 km as well as widening of National Highway -131A from 5.500   From 0.200 kilometre in the state of Jharkhand to 15.885 kilometre
           km to 6.000 km in the state of Bihar to four-lane standards is going   including Ganga Bridge, development of Manihari Bypass From
           in full swing. This information was recently shared by the Union   0.000 kilometre to 5.500 kilometre as well as widening of National
           Minister for Road Transport and Highways Nitin Gadkari over a series   Highway -131A from 5.500 kilometre to 6.000 kilometre in the state
           of tweets. According to Gadkari, the new link of National Highway   of Bihar to 4-lane standards is in full swing. The new link of NH-133B
           -133B project spanning 21.68 km length, is a project of one of its   project spanning a length of 21.68 kilometres, is a one of its kind
           kind, involving the construction of a 6 kilometre long Ganga Bridge   project involving the construction of a 6 kilometre long Ganga
           (which is the world’s third-longest extra-dosed bridge), Manihari   Bridge, Manihari bypass and also, widening of NH-131A.
           bypass as well as widening of National Highway -131A.
           According to Gadkari, once constructed, the highway shall
           connect Sahibganj in Jharkhand to Manihari in Bihar. The highway
           aims to reduce travel distance by 1/10th, the minister said. Besides,
           he further said, this will serve as a strategic connecting point to
           North East as well. Under construction at present, 2750 construction
           workers have been engaged in total to deliver this project, which is
           worth `1900 crore, Gadkari said. The project will further reduce the


        44   CONSTRUCTION OPPORTUNITIES|JULY 2022
   39   40   41   42   43   44   45   46   47   48   49