Page 112 - CO_Feb_2023
P. 112

BUSINESS BUZZ  CONTRACT AWARDED       `1024 Crore order for Collection,   The Company has won an order for


                                                      Value `1024 Cr
                   Value `1373 Cr
                                                                                         Value `183 Cr
                                                  Antony Waste Group secures
             Dilip Buildcon Ltd bags two HAM
                                                                                  R.P.P Infra Projects wins New Order
             projects in Andhra Pradesh worth
                                                                                        worth `183.60 Crores
                                                 Transportation, Processing and
                     `1,373.6 crore
           Dilip Buildcon has received a letter of
                                                   Disposal of Construction &
                                                                                 Drain Works in M1 & M2 Components in
           acceptance (LoA) for two HAM projects
                                                      Demolition Waste
                                                                                 Kovalam Basin in expanded areas in
           under Bharatmala Pariyojana Phase-1   Antony Waste Handling Cell Limited   Construction of Integrated Storm Water
           of Package-1 and Package-4 in Andhra   (“AWHCL”), India’s leading integrated   Greater Chennai Corporation Package
           Pradesh from National Highways     solid  waste  management  company,   4, Package 5 & Package 8 and is
           Authority of India (NHAI).         enhances its leadership in the waste   expected to be completed within 24
           The scope of the projects involves the   management space with AG Enviro   Months from the appointed date.
           development of a six-lane access-  Infra Projects Private Limited, its
           controlled greenfield highway from   wholly owned subsidiary, securing   Value `1000 to 2500 Cr
           Kodur to Vanavolu of Package-1 of   an `1,024 Crore order for Collection,
           NH-544G, Bengaluru Vijayawada      Transportation, Processing and Disposal   L&T Construction awarded Significant
           Economic Corridor. The bid is worth   of Construction & Demolition Waste in   contract for its Buildings & Factories
           `599.50 crore for the project. Similarly,   the Western Division of Mumbai.     Fast Business
           Package-4 involves development     The contract is a first of its kind for   The Buildings & Factories (B&F) Fast
           from Odulapalle to Nallacheruvu-palli   the Company and the project entails   Business of L&T Construction has
           of NH-544G, Bengaluru Vijayawada   collection, transportation, processing &   secured a significant repeat order from
           Economic Corridor, and the bid is   disposal of construction & demolition   a reputed and prestigious commercial
           worth `774.10 crore for the project.  (C&D)  waste  in  9  wards  of  Western   developer, one of India’s largest
           The completion period for both     Division of the city of Mumbai. The   mixed-use developers and operators.
           Package-1 and 4 is estimated to be   contract tenure is for 21 years which   The mandate is to construct two towers
           24 months, and the operation period   includes mobilization period of 12   with commercial office space in
           is 15 years.                       months. The Contract would involve   Hyderabad with approximate built-up
                                              Collection and processing of around   areas of 28.91 lakh sq. ft and 28.53 lakh
                   Value `1058 Cr             600 tpd of debris waste with a potential   sq. ft respectively.
                                              upside of about 25%.               The project scope includes civil work
            Rail Vikas Nigam bags orders worth   The key features of the order include:  for the composite structure including
                      `1,058 crore            •   Processing of Construction     MEP, finishes & façade to  construct
           Rail Vikas Nigam has emerged as the   & Demolition Waste using        the towers in 6B+G+22 floors and
           lowest  bidder  for  metro  projects  in   mechanized process into useful   6B+G+41 floors configurations. The
           Surat and Ahmedabad. The combined     products and its sale into the   project is scheduled to be completed
           projects are worth `1,058 crore.      market. Disposal of  inert  to  the   in 18 months.
           Rail Vikas Nigam participated in a    disposal site.
           consortium with Siemens India to bid   •   Collection & Transportation of      Value `60 Cr
           for the above projects in Surat and   Construction & Demolition Waste.
           Ahmedabad, in which Siemens is the                                    Choice Group wins another contract
           lead partner with 65% share and RVNL       Value `726 Cr              worth over `60 Crores for Jal Jeevan
           has a share of 35%.                                                                Mission
           For Surat metro rail project - Phase 1,   Ion Exchange (India) bags contract   Choice Consultancy Services Private
           RVNL has to oversee the power supply    is valued at `726.13 crore    Limited, a wholly owned subsidiary
           receiving and distribution system and   Ion Exchange (India) has received   of (Choice International Limited), a
           the project cost is estimated at `673.80   a contract order from Indian Oil   diversified conglomerate has recently
           crore. The Surat metro rail project is to   Corporation (IOCL) for the works   won contracts amounting to approx.
           be completed in 19 months. Supply,   pertaining to Panipat refinery capacity   `60 Crores to provide support for
           Erection, Testing and Commissioning of   expansion project (P-25) at Panipat,   various rural water supply schemes
           Power Supply Receiving & Distribution   Haryana The contract includes installing   under Indian government’s Jal Jeevan
           System, 750 V DC Third Rail Traction   water treatment plant including reverse   Mission.
           Electrification and Scada System for   osmosis, demineralization plant,   The scope of work for the contracts
           Surat Metro Rail Project Phase-I,”  condensate polishing unit and zero   have been awarded for the state of
           Similarly, for Ahmedabad Metro Rail   liquid discharge plant.         Maharashtra for Project Management
           Project Phase-2, RVNL will be in charge   The contract is valued at `726.13 crore.  Consultancy Services. The estimated
           of testing and commissioning of power   The project is to be constructed and   total project cost will be  `4800
           supply receiving and distribution   commissioned within 24 months from   Crores and is expected to generate
           systems. The project cost is estimated   the date of letter of acceptance   consultancy fees for Choice Group
           at  `384.30 crore with a completion   (LoA)  and  entails  an operation and   of `60 Crores to be executed over a
           time of 19 months.                 maintenance period of two years.   period of 2 years.


        112  CONSTRUCTION OPPORTUNITIES|FEBRUARY 2023
   107   108   109   110   111   112   113   114   115   116   117