Page 44 - CO January 2022
P. 44
®
CRANES - TOWER & MOBILE
SPOTLIGHT (WATERPROOF, BREATHABLE & DRYING) PLASTERS
UNIQUE HIGH PERFORMANCE WBD
Ready to use Fully 100% Easy WATERPROOF PLASTER
Plaster Breathable Water-Proof Drying
100% waterproof, doesn’t allow water
penetration in heavy rains and can resit
high hydrostatic water pressure
DRYING PLASTER
Sucks the dampness and moisture from
the substrate and dries it out
Comansa overcomes the logistical One Step Waterproofing Solution for
challenges of an historic project for the ▶ Basement Retaining Walls
Indian railway ▶ UG Tanks/ STPs BREATHABLE
A Comansa 21CM550 A 25-ton 21CM550 tower crane is working particularly heavy loads must be moved, such
tower crane is working on the construction of Anji Khad Bridge, the as those in bridge construction. ▶ Wet Areas Vapor/ moisture permeable - moisture is
on the construction of first cable-stayed railway bridge in India, 331 Thanks to its easy assembly and smaller space not entrapped, it evaporates easily
the first cable-stayed metres above the river. This is an historic project requirements, the flat-top design patented by ▶ External Walls exposed to Heavy Rains
for the Indian railway and it’s viewed as an
the crane manufacturer has overcome the
railway bridge in India, engineering wonder thanks to the difficulties logistical challenges linked to the complicated
which is considered an involved in the construction process and the topography in the area. Additionally, the
engineering wonder. technology used. automatic trolley change, along with the
In January 2017, Indian Railways awarded Power Lift system, allows variable loads to be
HCC (Hindustan Construction Company) the dealt with efficiently while ensuring the crane
contract to build a cable-stayed bridge for achieves maximum efficiency.
the prestigious Udhampur Srinagar Baramulla In addition to these logistical challenges linked
Rail Link Project (USBRL) being developed by to topographical aspects, Anji Khad Bridge is ECMAS WBD Plaster ECMAS WBD -
Konkan Railway Corporation Limited (a public being built in a difficult terrain. This factor is not 100% Waterproof ability
company in India) to connect Katra and Reasi a problem either, given that Comansa cranes
Station on the Jammu-Baramulla line. are equipped with a lightning protection
Initially, an arch bridge was planned in Anji system that has been designed to prevent
Khad but, in the end, an expert technical damage to electronic devices. Furthermore,
committee decided that the location was they’re designed to withstand wind pressure
unsuitable for this kind of bridge and the in accordance with European C25 standards.
decision was made to build a cable-stayed In addition, Comansa is enjoying the
bridge with a single pylon standing 331 metres collaboration of M/S Escorts Limited, its local
above the riverbed. partner in India, which allows it to use a trusted High Breathability Excellent Dehumidifying
To respond to the demands of the project technical service and acquire spare parts ability
and the challenge involved in constructing as quickly as possible in order to meet the
the pylon at such a remote, complex site, project’s demanding deadlines and open this
HCC selected a 21CM550 flat-top crane, in great project in December 2022.
Comansa’s 2100 series, designed to ensure ECMAS CONSTRUCTION CHEMICALS PVT. LTD
optimal performance in projects where For more details visit: www.comansa.com
Phone: +91 93470 52473 7-4-124 Gaganpahad,
E-mail: info@ecmas.co.in International Airport Road
44 CONSTRUCTION OPPORTUNITIES|JANUARY 2022 Website: www.ecmas.com Hyderabad, India - 500 052