Page 71 - Construction_Opportunities_February_2026
P. 71

11 th
                                                       ANNIVERSARY
                                                         ED
                                                         ED
                                                         ED ITION                 CONTRACT AWARDED
                                                         ITION
                                                         ITION
           Value `1000 – 2500 cr                   Value `98 cr                       Value `53 cr
                                                                             Concord Control Systems Bags `53.73
          L&T Transportation Infrastructure   Globe Civil Projects Limited Wins Major  announced that its associate company,  BUSINESS BUZZ
         Vertical Wins Road Development   `98.85-Crore Construction Contract at   Crore KAVACH 4.0 Order from Indian
               Contract in Dubai                      IIT Delhi.                         Railways.
       The Transportation Infrastructure   Globe Civil Projects Limited, a  firm   Concord Control Systems Limited
       business vertical of L&T has secured a   specializing in civil construction  and
       significant contract for the improvement   infrastructure development, has   Progota India Private Limited, has won a
       of Latifa Bint Hamdan Street in Dubai,   been named the Lowest Bidder for a   `53.73 crore order from Indian Railways
       UAE. The order pertains to the Phase-1   residential building project at the Indian   for the supply, installation, testing, and
       of the road development initiative   Institute of Technology Delhi Extension   commissioning of on-board KAVACH
       undertaken by the UAE authorities.   Campus, Sector-3, R.K. Puram. The   4.0 equipment. KAVACH 4.0 is India’s
       The scope of the project includes   project involves constructing a 3B+G+11   indigenous Automatic Train Protection
       upgrading the existing road corridor   residential building along with allied   (ATP) system, designed to prevent
       stretching  from  Emirates  Road  (E611)   services, with a total project value of   collisions,  overspeeding,  and  signal-
       to Sheikh Mohammed Bin Zayed Road   `98.85 crore and a completion period   passing-at-danger incidents. The
                                                                            project is scheduled for completion
                                         of 18 months.
       (E311). The work involves widening the                               within 12 months.
       current two-lane dual carriageway into
       a four-lane dual carriageway in each      Value `2350  cr
       direction to enhance network capacity   Transrail Secures  `2,350 Crore of    Value `185  cr
       and ease traffic flow.                    Domestic EPC Orders         Concord Control Systems Lands Major
       A significant feature of the project   Transrail Lighting Limited, a leading   `185.09 Crore KAVACH 4.0 Contract
       will be the construction of a major   turnkey EPC player in Power Transmission   With Indian Railways.
       structural interchange at E311,   &  Distribution  (T&D)  with  diversified   Concord Control Systems Limited (BSE:
       designed to enable seamless traffic   operations across Civil, Railways, Poles   CNCRD), a leading Indian manufacturer
       movement across all directions.   & Lighting and Solar EPC, has secured   of embedded electronic systems
       Beyond the interchange, the corridor   new orders aggregating to  `2,350   and critical electronic solutions, has
       will be extended with a new four-lane   crore, primarily in the domestic T&D   secured a major  `185.09 crore order
       dual carriageway along Latifa Bint   segment along with a Civil order and   for the supply, installation, testing, and
       Hamdan Street. The development    select wins in Poles & Lighting.   commissioning of the KAVACH 4.0
       also includes a dedicated interchange                                system. The order, awarded through
       to facilitate U-turn movements             Value `733  cr            Progota India Private Limited-an
       and provide improved access to                                       associate company of Concord—is
       developments located on both sides   Bharat Electronics Ltd Bags `733   scheduled for execution over the next
       of the corridor. The project is scheduled    Crore Orders.           12 months.
       to be completed in 36 months.     Navratna defence public sector
                                         undertaking Bharat Electronics Limited     Value `1500  cr
                                         (BEL) has secured orders worth  `733
               Value `1000 cr            crore. The major orders include a   BHEL Bags Strategic SAIL Power Plant
                                         range of defence and communication             Contract.
        BHEL Wins Major `1,000 Cr Contract   equipment such as TR modules,  Bharat Heavy Electricals Limited (BHEL)
            from Hindalco Industries..   radars, jammers, encryptors, software  has received a Letter of Acceptance
       Bharat Heavy Electricals Ltd (BHEL)   solutions, test equipment,  as  well  as  from Steel Authority of India Limited
       has secured an order worth between   upgrades, spares, and related services.  (SAIL) for the Captive Power Plant (CPP)
       `1,200 crore and  `1,500 crore from                                  Package No. CPP-1, part of SAIL’s
       Hindalco Industries.The company said       Value `2163  cr           4.08 MTPA Cold Strip (CS) expansion
       it has received a letter of intent (LoI)                             at the IISCO Steel Plant in Burnpur.
       from Aditya Aluminium, a subsidiary   KNR Constructions Bags `2,163-Crore   The turnkey contract includes design,
       of Hindalco Industries, for the project.  Infrastructure Order in Tamil Nadu.  engineering, manufacture, supply,
       The scope of work includes the design,   KNR Constructions has secured a  transportation, unloading, storage,
       engineering, manufacture and supply   `2,163-crore contract to build a four-  erection, commissioning, and
       of equipment up to the project site,   lane elevated corridor along the  performance guarantee tests for the
                                         East Coast Road (ECR), connecting  power plant, with civil works excluded.
       along with unloading, storage, erection,   Thiruvanmiyur to Uthandi in Chennai.  The domestic, global tender award
       commissioning and performance     The  elevated  corridor,  designed  to  is  valued  between  `1,200  crore  and
       guarantee testing for a 2x150 megawatt   improve traffic flow and connectivity  `1,500 crore (excluding GST). BHEL aims
       boiler, turbine and generator (BTG)   along the busy ECR stretch, is expected  to complete commissioning within 39
       package. The contract excludes civil   to be completed within approximately  months from the contract’s effective
       works.                            three years.                       date.


                                                                      FEBRUARY 2026|CONSTRUCTION OPPORTUNITIES  71
   66   67   68   69   70   71   72   73   74