Page 46 - COAug2022
P. 46

TICKER TAPE
          INFRASTRUCTURE  Prime Minister Narendra Modi inaugurated the main tunnel and
            PM MODI INAUGURATES PRAGATI MAIDAN INTEGRATED
                       TRANSIT CORRIDOR PROJECT

           five underpasses of the Pragati Maidan Integrated Transit Corridor
           Project in New Delhi
           According to Prime Minister’s Office (PMO), the Integrated
           Transit Corridor project is an integral part of the Pragati Maidan
           Redevelopment Project.
           The Integrated Transit Corridor project has been built at a cost of
           more than `920 crore, entirely funded by the central government.
           It is aimed to provide hassle-free and smooth access to the new
           world-class exhibition and convention centre being developed at
           Pragati Maidan, thereby facilitating easy participation of exhibitors   have been constructed in order to facilitate the movement of the
           and visitors in the programmes being held at Pragati Maidan, said   traffic from either side of the parking lot.
           the PMO release.                                    It is equipped with the latest global standard facilities for smooth
           Further, it will ensure hassle-free vehicular movement, helping   movement of traffic such as smart fire management, modern
           save time and cost of commuters in a big way. It is part of the   ventilation and automated drainage, digitally controlled CCTV and
           overarching vision of the government to ensure ease of living for   public announcement system inside the tunnel. This long-awaited
           people through transforming urban infrastructure.   Tunnel will serve as an alternative route to Bhairon Marg, which is
           The main tunnel connects Ring Road with India Gate via Purana   running much beyond its carrying capacity and is expected to
           Qila Road passing through Pragati Maidan. The six-lane divided   take more than half of the traffic load of Bhairon Marg.
           tunnel has multiple purposes, including access to the huge   Along with the tunnel, there will be six underpasses - four on
           basement parking of Pragati Maidan. A unique component of   Mathura Road, one on Bhairon Marg and one on the intersection
           the Tunnel is that two cross tunnels below the main tunnel road   of Ring Road and Bhairon Marg.

            BCPL RAILWAY INFRA ON BAGS TWO MAJOR ORDERS
           BCPL Railway Infrastructure Limited has announced that the
           Company secures two orders — one of 25KV OHE under BSP
           Division of South East Central Railway and another of TSS (Traction
           Sub-station) under Delhi Division of Northern Railway.
           Contributing towards connecting the rural parts of the Madhya
           Pradesh, the Company has received work order of Electrification
           of 3rd Line between Singapur Road to Vilayatkala Road including
           modification of yards by 2x25 KV OHE in connection with Annuppur
           to Katni 3rd Line in Bilaspur Division under South East Central
           Railway, comprising of project cost of `392.51 million.
           Further the Company has also received a work order of
           Improvement work at TSS over Delhi Division under Northern
           Railway, comprising of project cost of `13.67 million.
           The total value of the two orders comprises of `406.18 million

               RUDRABHISHEK ON BAGGING JJM PROJECT IN          The company is already preparing DPRs for a piped water delivery
                        JALPAIGURI, WEST BENGAL                plan in West Bengal’s ‘Katwa subdivision of Purba Bardhhaman
           The PHE Directorate, Jalpaiguri Division, West Bengal has   District’ for PHED to service 98 villages.”
           appointed Rudrabhishek Enterprises Ltd. (REPL), a leading Delhi-  Besides water supply projects, REPL works on infrastructure and
           based  infrastructure  consultancy  firm,  to  prepare  a  Detailed   planning projects for both the state and central governments
           Project Report (DPR) for the Implementation of the New Piped   across India. Smart Cities projects, PMAY, BIM consulting, GIS-
           Water Supply Scheme for uncovered areas under Jalpaiguri District   based master plans, Roads & Highways, street vending designs,
           Block-Mal. REPL will develop 21 DPRs to cover 72 communities in   and an online building plan approval system are just a few
           Jalpaiguri District’s Mal block. The government envisages providing   examples.
           a safe and appropriate drinking water supply to residents in their
           homes in the Jalpaiguri division through this initiative, thereby
           significantly improving health and living circumstances.
           REPL will prepare Piped Water Network Systems, which will include
           a route survey using a Differential Global Positioning System (DGPS)
           (DGPS). It will also create a water distribution and transmission
           network layout plan.


        46   CONSTRUCTION OPPORTUNITIES|AUGUST 2022
   41   42   43   44   45   46   47   48   49   50   51