Page 54 - April 2022
P. 54

TICKER TAPE
      INFRASTRUCTURE  At least 21,000 people took their first ride on Pune Metro’s inaugural   Sabha Speaker and senior BJP leader Sumitra Mahajan.
         PUNE METRO: OVER 21,000 COMMUTERS TAKE FIRST
              METRO TRAIN RIDE ON INAUGURAL DAY
                                                           Gadkari, speaking on the occasion, said these National Highway
                                                           projects will provide easy transport facility to the pilgrims and
                                                           tourists.
       day. Earlier in the day, Prime Minister Narendra Modi inaugurated
                                                            Also, better connectivity will be available from agricultural markets
       two stretches of the metro network totalling 12 kilometres. The PM
                                                           adjoining Ujjain, the Union Minister said. He also mentioned
       on the metro ride from Garware college station to Anandnagar
       station was accompanied by students of Garware school and
                                                           that the Ujjain-Dewas Industrial Corridor will develop and new
       students from a school for special children, according to an IE
       report. At present, Pune Metro trains will be run on two routes- 5
                                                           and Highway Minister said along with this, the entire Malwa-Nimar
       kilometres from Garware college to Vanaz station and 7 kilometres   employment opportunities will be created. The Road Transport
                                                           region will be developed, the border areas will be developed as
       from  PCMC  to  Phugewadi,  both  routes  comprising  five  mero   storage centres as well as time, fuel will be saved and also, travel
       stations. The minimum fare is of `10 while the maximum fare is of   will be safe.
       Rs 20. The fare for the return journey is of `30. The train frequency   A few days ago, in Vijaywada, Andhra Pradesh, Gadkari
       is of 30 minutes. The metro facility will be open daily from 8:00   inaugurated and laid foundation stone of 51 National Highway
       AM to 9:00 PM.                                      projects of 1380 Kilometres total length, worth  `21,559 crore.
       The PM on the metro ride from Garware college station to   According to the minister, improved road connectivity in the
       Anandnagar station was accompanied by students of Garware   coastal area will give a boost to the tourism industry, generate
       school and students from a school for special children.  jobs for urban and rural youth, playing an important role in bringing
       There  are  two  corridors  on  the  Pune  Metro  Rail  Project  with  a   prosperity to the people of Andhra Pradesh.
       total length of 33.2 kilometres, North-South Corridor (Purple Line)   He also said the construction of ROBs under Setu Bharatam will
       and East-West Corridor (Aqua line), covering 30 metro stations.   facilitate hassle free traffic movement, ensure commuters’ safety,
       The length of the elevated section is 27.2 kilometres and the   save time, fuel and reduce pollution.
       length of the underground section is 6 kilometres. Pune Metro
       has two maintenance depots, one each at Vanaz and Range   DMRC, CPWD SIGN MOU! DELHI METRO TO CONSTRUCT
       Hills. Once the metro network is fully operational, the train services   METRO LOOP CORRIDOR PLANNED UNDER CENTRAL
       will be operated with a total of 34 metro trains in three-car train   VISTA PROJECT
       configuration. Following are some details on North-South and East-  A Memorandum of Understanding (MoU) has been signed by
       West Corridors:                                     the Delhi Metro Rail Corporation (DMRC) and the Central Public
       •   The  North-South  Corridor  passes  through  Pune’s  industrial   Works Department (CPWD) as per which Delhi Metro shall provide
          area of Pimpri-Chinchwad and further into the city’s old Peth   technical assistance and execute finishing & services works for a
          areas. This corridor’s length is 17.5 kilometres with 14 metro   Metro loop corridor’s construction to link the existing Metro network
          stations. Six kilometres section on this corridor from Range Hills   with the new Central Secretariat buildings, which will come under
          to Swargate is underground.                      the Centre’s ambitious Central Vista Area Redevelopment project.
       •   The East-West Corridor is fully elevated. It starts from Vanaz   According to DMRC, to cater to the office goers who shall travel to
          Depot in the east and passes through the city’s densely   these offices using the Delhi Metro, around 3 km long metro loop
          populated residential areas. The corridor length is of 15.7   corridor, connecting four stations of Common Central Secretariat
          kilometres with 16 metro stations.               with the existing Delhi Metro’s Central Secretariat station is being
       Meanwhile, the Pune Metropolitan Region Development Authority   proposed.
       is implementing Pune Metro Line-3 on a PPP basis. Tata-Siemens   According to Delhi Metro, the planning is being done expecting
       JV has been awarded the concessionaire contract for the same   a peak hour demand of 20,000 commuters per hour during the
       and work on this has started in January 2022.       peak hours of morning and evening. The entire metro loop corridor
                                                           shall be underground. As per the Memorandum of Understanding,
        NITIN GADKARI LAID FOUNDATION STONE FOR 11 NH      the Detailed Project Report (DPR) will be prepared by DMRC apart
         PROJECTS WORTH OVER `5,000 CRORE IN MADHYA        from finalising the horizontal and vertical alignment of the metro
                            PRADESH                        tracks and tunnels along with sizing of facilities such as platforms,
       Recently, the Union Minister for Road Transport and Highways,   support services as well as maintenance facilities. The Delhi Metro,
       Nitin Gadkari laid foundation stones for as many as 11 National   for the project, will also appoint the Detailed Design Consultant.
       Highways projects in the state of Madhya Pradesh. These National   While the basic civil structure construction work will be carried out
       Highway projects will have a total length of 534 kilometres and will   by the Central Public Works Department, all other finishing and
       be developed at a cost of `5722 crore.              services works including design as well as construction of control
       According  to  the  Road  Transport  and  Highways  Minister,   systems, track work, signal systems, rolling stock, electrical and
       the government is taking continuous steps to develop next   maintenance works, etc., will be executed by the Delhi Metro
       generation infrastructure with a commitment in order to ensure   Rail Corporation. At present, the corporation is operating a Metro
       faster development, smooth connectivity, better security as   network of 391 kilometres with as many as 286 Delhi Metro stations.
       well as prosperity for all. Gadkari laid the foundation stones in   The DMRC, as part of its fourth phase of expansion, is currently
       the presence of Union Minister of State Gen V.K. Singh, Madhya   engaged in the construction of 65 kilometres of new lines across
       Pradesh Chief Minister Shivraj Chouhan as well as Former Lok   three different metro corridors.


    54   CONSTRUCTION OPPORTUNITIES|APRIL 2022
   49   50   51   52   53   54   55   56   57   58   59