Page 65 - March_2022.indb
P. 65

Value `885 Cr
              Value `1000 to 2500 Cr             Value `2500 to 5000 Cr               CONTRACT AWARDED
                L&T Construction Awarded       L&T Construction Awarded (Large*)  company has been declared the L1  BUSINESS BUZZ
                                                                                 PNC Infra Rises ~1% on bagging new
           (Significant*) Contract for its Buildings   Contract for its Buildings & Factories   order worth `885 Crore
                  & Factories Business                    Business              In its press release on Friday, PNC
           The construction arm of Larsen &   The construction arm of Larsen &   Infratech Limited, announced that the
           Toubro has secured a significant order   Toubro has secured a large order for
           for its Buildings & Factories business   its Buildings & Factories business from   (lowest) bidder for an NHAI Project of
           from a reputed developer.          the Government of Odisha to construct   32.98 km long, four laning of Mathura
           The residential business of Buildings   clinical blocks & allied infrastructure for   Bypass to Gaju Village section of NH
           and Factories has secured this     a state-of-the-art hospital in Cuttack.   530B in the State of Uttar Pradesh, to be
           order to construct one of the largest   The duration of this EPC project is   executed on Hybrid Annuity Mode for a
           residential townships in Bengaluru.   30 months. The project involves   Bid Project Cost of `885 crore.
           The project involves construction of   construction of four  clinical blocks   The price bids were opened on Friday,
           6,768 apartments spread across 39   (B+G+9 floors) comprising composite   February 25, 2022, with PNC’s bid being
           Towers with 2 Basements + Ground   structural systems & other ancillary   the lowest (L1).
           + 27 to 31 Floors. Additionally, the   buildings with a total built up area of 3.4   PNC  is  expected  to  complete  this
           development entails 149 villas along   Mn Sqft. The state-of-the-art facility will   project within a period of 24 months
           with club houses, swimming pools and   cover specialty departments such as   and shall remain operative for a period
           other amenity structures. The total built   Neurology, Nephrology, Endocrinology,   of 15 years post-construction.Following
           up area will be 13.43 million sq.ft. The   Gastroenterology, Hematology,   this development, PNC Infra jumped
           project is scheduled to be completed   Hepatology, Cardiology, Surgical   1.15% at `264.95 against its previous
           in 42 months.                      blocks, Casualty, trauma & general   closing price of Rs261.95. It touched
           The scope of works includes Design   surgery with a total of 2058 beds. The   day’s high and low of `275 and `258.80
           & Construction of entire civil structure   scope  of  work  includes  Design  and   respectively, so far.
           including  waterproofing,  masonry,   Execution of Architecture, Structure
           plastering and electrical conduiting.  –  Composite  System,  Electrical,  VHT,
                                              ELV Systems covering data voice, BMS,      Value `592 Cr
                                              ACS, CCTV, AV, PMS, NCS, QMS, AMS,
                   Value `2747 Cr             Car Park management system, Asset    GR Infraprojects bags order from
            G R Infraprojects’ bags order from   Management system, PHE system,   Noida Metro Rail Corporation project
                   NHAI worth `2747 cr        HVAC,  FPS  covering  water  curtain      worth `592.99 crore
           GR Shirsad Masvan Expressway Private   system,  High  velocity  water  spray   GR Infraprojects Limited has bagged
                                                                                 an order from Noida Metro Rail
           Limited, wholly-owned subsidiary of G   & gas suppression system, MGPS,
           R Infraprojects has received an order   Steam Boilers, LPG, Kitchen & Laundry   Corporation, for part design and
           from the National Highways Authority   Equipment, Automatic waste & laundry   construction of elevated viaduct and
           of India (NHAI) worth `2747 crore.The   system, Medical Pneumatic  Tube   five elevated stations, of Noida-Greater
                                                                                 Noida Metro Rail Project. The scope of
           project is for Construction of Eight   Systems, Modular integrated OT, BMU   work is Part Design and Construction
           lane access controlled Expressway   System, Interior Works & Solar Panels   of Elevated Viaduct and 5 elevated
           from Km 26.582 to Km 50.700 of Main   for energy efficiency. The scope also
           Expressway and Km 0+0 to Km 3+000   includes Maintenance for 5 years for   stations viz Noida Sec -122, Noida Sec-
           of SPUR (Shirsad to Masvan Section of   VHT, Landscape, FAS, CCTV, ACS, AV &   123, Gr. Noida Sec-4, Ecotech-12, Gr.
                                                                                 Noida Sec-2, (excluding Architectural
           Vadodara Mumbai Expressway) in the   AMS.                             finishing Works and PEB works of stations)
           State of Maharashtra on Hybrid Annuity                                from Chainage 0.00 m to Chainage
           mode under Bharatmala Pariyojana            Value `187 Cr
           (Phase II-Package XIII), the estimated   GPT INFRA Bags Order Valued at   9605 m of Noida -Greater Noida Metro
           completion period is 2 years while           `187.81 Crore            Rail Project. The completion period is
                                                                                 24 months.
           operation period is 15 years from COD.
                                              GPT Infraprojects Limited ) has bagged
                                              an order valued at `187.81 Crore.
                    Value `235 Cr             The  order  has been received from         Value `124 Cr
                                              Office of the General Manager,
           Transformers and Rectifiers (India) Ltd   Tender & Contract, Maharashtra   Surya Roshni Ltd receives order of
           gets order worth `235 crores from GETCO  Rail  Infrastructure  Development      `124.35 crore
           Transformers and Rectifiers (India)   Corporation Limited for construction of   Surya Roshni Ltd has obtained order
           Limited has been awarded orders of   Cable Stayed Road over Bridge (ROB)   amounted to `124.35 crore (excluding
           Transformers for total contract value   near Byculla railway Station at Railway   GST) for supply of API 3LPE Coated Pipes
           of  `235 Crores from Gujarat Energy   Km 3/16-18 between Sandhurst Road -   for LPG Pipeline Project to IHB Limited,
           Transmission Corporation Limited   Byculla stations on CSTM-Dadar Section   a Joint Venture of Indianoil, Hindustan
           (GETCO).                           in Mumbai Division of Central Railway.  Petroleum & Bharat Petroleum.


                                                                            MARCH 2022|CONSTRUCTION OPPORTUNITIES  65
   60   61   62   63   64   65   66   67   68