                                               Equipment going forward


                EVEREST ENGINEERING      We observe a changing trend in the market   3 x 11KW Motor to run at a speed of 33 to
           EQUIPMENT PVT LTD, is in the   after Covid19. Most of the customers are   36 M/Min. The speed will be getting reduced
           business of providing high-   preferring to go with equipments on rental   even up to 28 M/Min when operated with
                                         instead of purchase. One reason is to avoid
                                                                              full load of 2 tonnes even though operated
              quality construction and   huge investment, and the other is to reduce   through VFD. Whereas GJJ passenger hoists are
             infrastructure equipment.   the maintenance cost, Staff, Operators … etc.  designed with NORD Germany Motor & gear
            P.V. RAMDEV, MD, provides    We also found some changes in equipment   box, Siemens VFD achieves 46 M/Min speed
              his insights on the latest   purchase ie:-                      with full load of 2 tonnes, with a power of only
             trends in the construction   a.  Fuel saving/Electricity saving is one of   2 x 11KW=22KW. This itself is showing a saving
           & Infra Equipment industry.      the very important area customers are   of 33% Electricity and an increased speed of
                                            concentrating to reduce the operational   30% due to proper design optimisation.
                                            cost.                             Last year we supplied 1 Unit GJJ Passenger
                                         b.  Breakdown history of the brand, As   hoist to RAYMOND LTD (Realty Division) with an
                                            the  breakdowns  are  leading  to  heavy   energy meter to prove the above savings. Now
                                            operational losses, project delay…etc.   there are 8 GJJ Passenger hoists at the same
                                         c.  Proven life of the equipment     “Thane Site” with energy meter, has proven
                                         d.  Resale value of the equipment    the power savings without reduction of load
                                         e.  Spare parts frequency and price.  & speed. Most of the contractors just look
                                         All the above factors were analysed by the   into the buying cost and spend around 3 to 4
                                         corporate companies, but after Covid19,   Lakhs of rupees every year on electricity which
                                         Almost all companies are closely checking the   is unwanted/ wastage to the nation.
                                         above parameters rather than checking the   We therefore request all  contractors to
                                         cost of the equipment. As the competition in   check all the operational parameters of any
                                         the market is very high, profit margins are low,   equipment before purchase / rental. Sometime
                                         every contractor is looking for ways to reduce   little higher purchase cost will save huge
                                         the operational costs and faster completion. As   operational cost, faster production, negligible
                                         an example  our GJJ brand Passenger hoist is   breakdowns leads to the faster completion of
                                         designed to save huge electricity. Normally 2t   the project.
                                         capacity single cage passenger hoist requires   For more details visit: www.everestengg.in