Page 60 - CO_December_2022
P. 60
BUSINESS BUZZ CONTRACT AWARDED Order for its Heavy Civil Infrastructure W S Industries (India) Ltd has has
Value `200 Cr
Value `1,000 - 2,000 Cr
Value `798 Cr
L&T Construction Wins a Significant
Alstom wins €98 million contract to
W S Industries India secures `200.55
design and manufacture 78 metro
crore order
Business
coaches for Chennai Metro Phase-II
Alstom has been awarded a
Larsen & Toubro has secured an order
contract worth `798 crores to design,
for the Construction of Integrated
manufacture, supply, test, and The Heavy Civil Infrastructure Business of bagged an order worth `200.55 crore
Bus Terminal and Multi Utility Facility
from the prestigious Greenko group,
commission 78 advanced metro one of the world’s leading renewable Center at Panjapur, Old Madurai Road,
coaches by the Chennai Metro Rail energy companies, for development of Tiruchirappalli, Tamilnadu - 620001,
Limited (CMRL). These new metro an off stream pumped storage project approximately valued at `200.55
cars will operate on the 26 km in Madhya Pradesh. Crores (including GST).
corridor, a part of Phase-II which will The Civil and Hydromechanical The order has been awarded by the
connect Poonamallee Bypass – Light works of the project will be executed domestic entity and caters to domestic
House through 28 (18 elevated & 10 through a Consortium led by Larsen & market. Further, time period by which
underground) stations. Toubro, under a stringent timeline of 30 the order is to be executed is 22
Scope of the contract includes months. Upon completion, the project months.
manufacturing of 26 metro trains will be one of the largest clean energy
(three-car configuration) that can projects of its kind in India.
operate at top speed of 80 kmph, as About Project: The Gandhisagar Value `207 Cr
well as training of personnel. With 25 Pumped Storage Project (PSP),
KV power supply for optimal energy- designed to meet a pumped storage Allied Digital, KEC International
efficiency, Alstom’s Metropolis metros capacity of 10,080 MWHr, envisages consortium wins smart cities project
will ensure safe and reliable passenger creation of an upper reservoir near worth `207.21 crore
transport for over 11 million citizens of Khemla block village, (about 75 Kms Allied Digital Services Limited has
the city. Additionally, the overall project from Neemuch, Madhya Pradesh) while received the Smart City contract for
will significantly contribute towards the existing Gandhisagar reservoir will the Punjab Municipal Infrastructure
the socio-economic development be the lower reservoir. The project Development Company (PMIDC) in
by connecting key zones. The metro involves constructing an Upper Dam consortium with KEC International
trains are designed & engineered to (to form the upper reservoir), Intake covering 3 cities i.e., Amritsar,
run driverless enabled with Unattended Structure with Approach Channel, Jalandhar, and Sultanpur Lodhi.
Train Operations (UTO). These trains Steel Lined Buried Penstock/Pressure The total contract value awarded to the
can completely run-on signals and Shaft (Vertical & Horizontal), Surface consortium is `207.21 crore.
its operations will be monitored from Powerhouse, Draft tube tunnel, Tailrace The project is expected to be
the Operations Control Centre (OCC). Outlet Structure, Tailrace channel, etc. completed in 57 months, with 9 months
In line with the Government’s ‘Make in Pumped hydro storage plants that for implementation and Go-Live and
India’ vision, these metro cars will be store energy using a system of two 48 months for project support and
100% indigenous manufactured at interconnected reservoirs have O&M.
one of Alstom’s largest urban rolling assumed immense significance
stock manufacturing facilities, in Sricity, today given the increased adoption
Andhra Pradesh. This facility has an of inherent variability. Water is pumped Value `2277 Cr
annual capacity of producing 480 to the upper reservoir in times of
cars and a strong portfolio of catering surplus energy and, in times of excess JMC Projects India secures new
to several domestic and international demand, water from the upper orders of `2,277 crore
metro projects. reservoir is released, generating power, JMC Projects (India) Limited (JMC), a
with an overall cycle efficiency of 80% leading Civil Engineering and EPC
Value `69 Cr or more. Company has secured new orders of
`2,277 crores.
Univastu India bags work order worth The details are as follows:
`69.33 crore Value `120 Cr • Water Projects in India of `1,497
Univastu India Limited has received crore
a work order of `69.33 crore for the Ahluwalia Contracts bags new order • B&F projects in India of `780 crore
construction of Haryana International worth `120.23 crore Commenting on securing new orders,
Habitat in Sector-1, Panchkula including Ahluwalia Contracts Limited has S. K. Tripathi (Managing Director & CEO)
civil, public health services, electrical secured an order worth `120.23 crore commented, “We are delighted with
installation fire-fighting arrangement, (approx) for the Construction of Lachit the new order wins in our Water and
landscaping, boundary wall and all Moidam Memorial & Cultural Complex B&F business. These new orders in the
other works contingent thereto from at Lahdoigarh, Jorhat, Assam from the Water business will help us to strengthen
Haryana Shehri Vikas Pradhikaran, Government of Assam, Office of Chief our leadership and capabilities in the
Panchkula. Engineer, PWD Building, Assam. Water business.
60 CONSTRUCTION OPPORTUNITIES|DECEMBER 2022

