Page 60 - CO_December_2022
P. 60

BUSINESS BUZZ  CONTRACT AWARDED     Order for its Heavy Civil Infrastructure   W S Industries (India) Ltd has has


                                                                                         Value `200 Cr
                                                 Value `1,000 - 2,000 Cr
                    Value `798 Cr
                                               L&T Construction Wins a Significant
            Alstom wins €98 million contract to
                                                                                 W S Industries India secures `200.55
            design and manufacture 78 metro
                                                                                            crore order
                                                          Business
            coaches for Chennai Metro Phase-II
           Alstom has been awarded a
                                              Larsen & Toubro has secured an order
           contract worth `798 crores to design,
                                                                                 for  the Construction  of Integrated
           manufacture, supply, test, and     The Heavy Civil Infrastructure Business of   bagged an order worth `200.55 crore
                                                                                 Bus Terminal and Multi Utility Facility
                                              from the prestigious Greenko group,
           commission 78 advanced metro       one of the world’s leading renewable   Center at Panjapur, Old Madurai Road,
           coaches by the Chennai Metro Rail   energy companies, for development of   Tiruchirappalli, Tamilnadu - 620001,
           Limited (CMRL). These new metro    an off stream pumped storage project   approximately valued at  `200.55
           cars will operate on the 26 km     in Madhya Pradesh.                 Crores (including GST).
           corridor, a part of Phase-II which will   The Civil and Hydromechanical   The order has been awarded by the
           connect Poonamallee Bypass – Light   works of the project will be executed   domestic entity and caters to domestic
           House through 28 (18 elevated & 10   through a Consortium led by Larsen &   market. Further, time period by which
           underground) stations.             Toubro, under a stringent timeline of 30   the order is to be executed is 22
           Scope of the contract includes     months. Upon completion, the project   months.
           manufacturing of 26 metro trains   will be one of the largest clean energy
           (three-car configuration) that can   projects of its kind in India.
           operate at top speed of 80 kmph, as   About Project: The Gandhisagar          Value `207 Cr
           well as training of personnel. With 25   Pumped Storage Project (PSP),
           KV power supply for optimal energy-  designed to meet a pumped storage   Allied Digital, KEC International
           efficiency, Alstom’s Metropolis metros   capacity of 10,080 MWHr, envisages   consortium wins smart cities project
           will ensure safe and reliable passenger   creation of an upper reservoir near   worth `207.21 crore
           transport for over 11 million citizens of   Khemla block village, (about 75 Kms   Allied Digital Services Limited has
           the city. Additionally, the overall project   from Neemuch, Madhya Pradesh) while   received the Smart City contract for
           will significantly contribute towards   the existing Gandhisagar reservoir will   the Punjab Municipal Infrastructure
           the socio-economic development     be the lower reservoir. The project   Development Company (PMIDC)  in
           by connecting key zones. The metro   involves constructing an Upper Dam   consortium with KEC International
           trains are designed & engineered to   (to form the upper reservoir), Intake   covering 3 cities i.e., Amritsar,
           run driverless enabled with Unattended   Structure with Approach Channel,   Jalandhar, and Sultanpur Lodhi.
           Train Operations (UTO). These trains   Steel  Lined  Buried  Penstock/Pressure   The total contract value awarded to the
           can completely run-on signals and   Shaft  (Vertical  &  Horizontal),  Surface   consortium is `207.21 crore.
           its operations will be monitored from   Powerhouse, Draft tube tunnel, Tailrace   The project is expected to be
           the Operations Control Centre (OCC).   Outlet Structure, Tailrace channel, etc.  completed in 57 months, with 9 months
           In line with the Government’s ‘Make in   Pumped hydro storage plants that   for implementation and Go-Live and
           India’ vision, these metro cars will be   store energy using  a system of  two   48 months  for project support and
           100% indigenous manufactured at    interconnected reservoirs have     O&M.
           one of Alstom’s largest urban rolling   assumed immense significance
           stock manufacturing facilities, in Sricity,   today given the increased adoption
           Andhra Pradesh. This facility has an   of inherent variability. Water is pumped   Value `2277 Cr
           annual capacity of producing 480   to the upper reservoir in times of
           cars and a strong portfolio of catering   surplus energy and, in times of excess   JMC Projects India secures new
           to several domestic and international   demand,  water  from  the  upper    orders of `2,277 crore
           metro projects.                    reservoir is released, generating power,   JMC Projects (India) Limited (JMC), a
                                              with an overall cycle efficiency of 80%   leading Civil Engineering and EPC
                    Value `69 Cr              or more.                           Company has secured new orders of
                                                                                 `2,277 crores.
           Univastu India bags work order worth                                  The details are as follows:
                      `69.33 crore                     Value `120 Cr             •   Water  Projects  in India of  `1,497
           Univastu India Limited has received                                      crore
           a work order of  `69.33 crore for the   Ahluwalia Contracts bags new order   •   B&F projects in India of `780 crore
           construction of Haryana International     worth `120.23 crore         Commenting on securing new orders,
           Habitat in Sector-1, Panchkula including   Ahluwalia Contracts Limited has   S. K. Tripathi (Managing Director & CEO)
           civil, public health services, electrical   secured an order worth `120.23 crore   commented, “We are delighted with
           installation fire-fighting arrangement,   (approx) for the Construction of Lachit   the new order wins in our Water and
           landscaping, boundary wall and all   Moidam Memorial & Cultural Complex   B&F business. These new orders in the
           other works contingent thereto from   at Lahdoigarh, Jorhat, Assam from the   Water business will help us to strengthen
           Haryana Shehri Vikas Pradhikaran,   Government of Assam, Office of Chief   our leadership and capabilities in the
           Panchkula.                         Engineer, PWD Building, Assam.     Water business.


        60   CONSTRUCTION OPPORTUNITIES|DECEMBER 2022
   55   56   57   58   59   60   61   62   63   64