SPOTLIGHT  ROOFING



































                                        Apollo Box Sections for Railways stations


             The Biggest Revolution,    The Indian Government is undertaking   faster speed of project completion, superior
           Ready to build 500 x 500     several initiatives to upgrade its aging   quality, strength, cost effectiveness and eco-
              mm Box Section from       railway  infrastructure  and  enhance  its   friendliness.
                                                                              With the help of APL Apollo’s wide range of
                                        quality  of  services.  The  scheme  of  station
                  APL APPOLO TUBES      redevelopment is in synergy with the Smart   structural steel tubes everything can be built
                                        City Project launched by the GOI. Currently,   on Tubular sections (Hollow Steel Sections)
                                        RLDA is focusing on the redevelopment of   which saves time and the fabrication gets
                                        155 railway stations in various cities in next   much easier. Minimal or no on-ground
                                        2-5 years.                            fabrication is required as it is pre-fabricated,
                                                                              precisely engineered and cut to length which
                                        Challenge                             speeds up the entire process.
                                        The main concern while redeveloping
                                        any railway station is the duration of the   APL Apollo for Railways
                                        project. The project execution needs to be   Recently,  APL  Apollo  has  come  up  with
                                        really fast, as the operations of the stations   another innovation, a much needed solution,
                                        cannot be stopped for too long. To ensure   which is, ready box sections of 500x500 mm
                                        faster execution of the project, easier   up to 20 mm thickness. These box sections
                                        fabrication and erection is required so that   were earlier made manually, heavy plates
                                        there is minimum disturbance to the regular   were transported, stored, cut and welded
                                        operations of the station.            from all the four sides, which increased the
                                                                              overall time of the project. Increase in project
                                        How APL Apollo Can help?              duration led to increase in the overall project
                                        To revolutionise the construction industry and   cost, while compromising the quality. Now,
                                        to make the construction faster and better,   these ready box sections are available in
                                        APL Apollo came up with a ‘Nayi Soch’   nick of time with APL APOLLO’s cutting edge
                                        that can transform the future of  building   technology, with no compromise in quality.
                                        and construction with its exclusive range   APL APOLLO’s world class technology has
                                        of heavy structural tubular products. Steel   a capacity of producing 500 tons of box
                                        Building Solutions technology and Apollo   sections in a day in cut to length sizes, with
                                        Column tubes are known as the heart of   better quality, minimum wastage and less
                                        Pre-Engineered Building (PEB) due to its   lead time.