Page 70 - CO April 2017 Full Issue
P. 70
case study COVER STORY Powered by RICHA INDUSTRIES achieves another milestone Lucknow Metro Station Project on Completion Lucknow Metro Rail Corporation (LMRC): Project of Lucknow Metro Stations in Capital of Uttar Pradesh, India is another milestone achieved by Richa Industries Ltd. The PEB covers a floor area of over 30,000 Sqm with a tonnage of over 1500 MT including all eight metro stations. The Scope of project includes Design, Project HigHligHts: Manufacturing, Supply and Commissioning Project Name Lucknow Metro Rail Corporation (Metro Stations via L&T) of First phase of LMRC Stations, which includes eight stations from Transport Location Lucknow, Uttar Pradesh (UP) Nagar to Charbaugh. Te vital aspect of Total Tonnage 1500 MT (approx) project was, Completion within stipulated Total Area 30,000 sqm time period of 6 months. Each station has the clear height of approx Clear Height 6.5 m 6.5 meter and rafters are arched with generated automatically with the help of achieved is that afer getting 2 station work approx 40 degree curvature, Sheeting is Tekla. It is veru help full for fast production order rest 6 stations also awarded to Richa Bend, Single skin, Bare Galvalume Hi- Rib of all stations as the project was strictly time due to their superlative performance. profle with 930- 1020 mm cover width, bound, Te complete planning of project Te PEB is designed according to the IS 28-32 mm crest’s @ 186-333 mm C/C was done on Steel2Build. Tis is in house 800:2002 code with the consideration of all manufactured and installed perfectly. For sofware of Richa. It is an ERP integrated internal and external factors such as Wind Natural lighting 2 mm thick “Diamond sofware easy to handle complete planning loads, Seismic loads, Design complexity shaped” Poplycarbonate sheet matched with Order booking to Afer sale services. etc. LMRC became a Landmark project the metal sheet profle and fxed accurately Richa had to face many challenges due to of Richa and took the company to much on 6 per cent of the Roof area. crucial time frame which LMRC has asked. higher heights. Richa Industries has done through planning Special arrangements were made by Richa Dr. Sandeep Gupta, MD, for this project from designing to fabrication from Erection point of view, Special safety Richa Industries Ltd, to erection. First the 3D model of complete measures and tools considered to manage said “We are very grateful station was prepared by efcient designers execution at elevated height of approx 16 for successful completion of Richa on STAAAD along with TEKLA meter and keeping in view of running trafc. of this project. It is a model, this helps to achieve faster designing Boom lif arranged at site for erection and signifcant achievement for and 3D visualisation which eliminates fxing louvers.Initially 2 station project was us. It exhibits our capability error while preparing fabrication drawings given to some other PEB Vendor but due to and experience of delivering any type of and easily integrated with BIM (Building incapable approach of exiting vendor, Later project within stipulated time period. It Information Modeling). it was handed over to Richa due to their shows the substantial efort of team Ticha. The single model covers all structural profcient track records in execution of non We are looking forward to serving the analysis and designing requirements. For standard complex projects. country with more contribution towards Fabrication CNC fles (fully scaled) are Another accomplishment which was Infrastructure projects.” u 72 construction opportunities|aPrIL 2017

